The second development well at the Monument oilfield in the United States is about to start drilling

U.S. independent oil and gas producer Talos Energy has disclosed that the first development well at the Monument field, located in the deepwater U.S. Gulf of Mexico, has been drilled. The operator, Beacon Offshore Energy, is preparing to spud the second development well, after which completion operations will be carried out on both wells. The project remains on track to achieve first oil by the end of 2026, with initial total production estimated at 20,000–30,000 barrels of oil equivalent per day.
Offshore oil drilling rig with red and gray columns, a crane, and a blue sky in the background.
The first development well is located in Walker Ridge Block 315, drilled to a total measured depth of 32,250 ft, and encountered 245 ft of net vertical pay in the structural high. Beacon stated that the drilling results are consistent with pre project predictions, indicating that the target Lower Wilcox reservoir characteristics match those obtained during the exploration and appraisal phases. The operator did not disclose the specific spud date for the second well.
Monument is situated in Walker Ridge Blocks 271, 272, 315 and 316. The project comprises two production wells and approximately 17 miles of subsea pipeline, tied back to the Beacon operated Shenandoah floating production facility. Talos disclosed that the project has secured firm processing capacity of 20,000 barrels per day, and that after the initial two wells are completed, they will be connected to the existing production system.
The Shenandoah floating production facility is located in Walker Ridge Block 52, about 150 miles south of the Louisiana coast, in a water depth of approximately 5,800 ft. Its nominal oil processing capacity is 120,000 barrels per day. Navitas Petroleum noted that the facility’s oil processing capacity was previously increased from 100,000 to 120,000 barrels per day, which includes capacity set aside for the Monument subsea tie back project.
The Monument project reached final investment decision in March 2024. Beacon Offshore Energy holds a total working interest of 41.67% and acts as operator, Talos Energy holds 29.76%, and Navitas Petroleum holds 28.57%. Following the completion of drilling of the second well, the project will move into the completion phase for both wells, subsea hook up, and commissioning for start up.
Reinjected Water Cyclone Desander
The extraction of oil and natural gas cannot be achieved without separation equipment.
Shanghai SAGA Offshore Engineering Co., Ltd., established in Shanghai in 2016, is a modern technology enterprise integrating R&D, design, production, and service. We are dedicated to developing separation and filtration equipment for the oil, gas, and petrochemical industries. Our high-efficiency product portfolio includes de-oiling/dewatering hydrocyclones, desanders for micron-sized particles, and compact flotation units. We provide complete skid-mounted solutions and also offer third-party equipment retrofitting and after-sales services. Holding multiple proprietary patents and operating under a DNV-GL certified ISO-9001, ISO-14001, and ISO-45001 management system, we deliver optimized process solutions, precise product design, strict adherence to engineering specifications, and ongoing operational support.
Multi-chamber hydrocyclone
Our high-efficiency cyclone desanders, renowned for their exceptional 98% separation rate, have earned recognition from international energy leaders. Constructed with advanced wear-resistant ceramics, these units achieve 98% removal of particles as fine as 0.5 microns in gas streams. This capability enables the reinjection of produced gas for miscible flooding in low-permeability reservoirs, a key solution for enhancing oil recovery in challenging formations. Alternatively, they can treat produced water, removing 98% of particles larger than 2 microns for direct reinjection, thereby boosting water-flood efficiency while minimizing environmental impact.
High Efficiency Ultra-Fine Particle Desander
Our new product—The High Efficiency Ultra-Fine Particle Desander is a liquid-solid separation device that utilizes an efficient centrifugal principle to separate suspended impurities—such as solids in produced water, seawater, condensate, fine particles in high-viscosity liquids, and catalyst powder in reactors—from fluids (liquids, gases, or gas-liquid mixtures). It effectively removes solid particles with sizes down to 2 microns (at 98% efficiency) or smaller.
The High Efficiency Ultra-Fine Particle Desander delivers high sand removal efficiency, capable of removing solid particles down to 2 microns. The equipment features a compact footprint, requires no external power or chemical additives, and has a service life of approximately 20 years. It offers online sand discharge capability without the need for production shutdown.
Proven in major global fields operated by CNOOC, CNPC, Petronas, and others across Southeast Asia, SAGA desanders are deployed on wellhead and production platforms. They provide reliable solids removal from gas, well fluids, and condensate, and are critical for seawater purification, production stream protection, and water injection/flooding programs.
Beyond desanders, SAGA offers a portfolio of acclaimed separation technologies. Our product line includes membrane systems for natural gas CO₂ removal, deoiling hydrocyclones, high-performance compact flotation units (CFUs), Shale gas desanding, Cyclonic dewatering package with produced water treatment, and multi-chamber hydrocyclones, delivering comprehensive solutions for the industry's toughest challenges.